Building Permits
 
1. Site Plan Must Show:

  • Legal Description (i.e. Lot, Block, Plan) and Civic Address
  • North arrow and scale of drawing
  • Description of the site’s boundaries including dimensions of property lines and their bearing relative to north, angles of corners, radii of curves
  • Identification of adjacent streets, alleys, and other public right-of-ways
  • Locations and dimensions of any easements that cross the site and/or other pertinent legal features
  • Dimensions of setbacks required by the Headingley Zoning By-law
  • Location and dimensions of existing structures and a description of any demolition by the new construction
  • Location, shape and size of the structure proposed for constructions, including roof overhangs and other projections
  • Location and dimensions of existing and proposed paved drives, parking areas, and walkways
  • Existing ground elevations and contour lines, and, where regarding is necessary, new contour lines  

2. Building Plans & Architectural Drawings Must Show:

  • Foundations and footing plans/details (must be stamped by P. Eng. Registered in the Province of Manitoba)
  • Basement plan or basement future layout with all required dimensions
  • Floor plan with dimensions and layout of rooms, windows, doors (for each floor)
  • Roof system plan and prefab truss drawings and specifications
  • Elevation drawings showing all sides, exterior finish location of doors, windows, chimneys that include size and elevation.
  • Details of cross sections, materials, dimensions and elevations
  • Plumbing layout and details showing sewer and water arrangement
  • Minimum scale for drawings 1:100  

NOTE:           Separate permits are required for plumbing, electrical, sewage disposal systems, and lot grading.

3. Manitoba Land Surveyor's Certificate:

  • The Development Officer may request the Manitoba Land Surveyor’s Certificate.

4. Certificate of Title          

  • The owner must provide a current copy of a certificate of title prior to any permits issued.
  • (3 months old max)

5. Other Information Required for a Building Permit

  • Address and legal description of building location
  • Owner's name, address, and phone number
  • Designer's name, address and phone number
  • Contractor's or builder's name, address, and phone number
  • Use and size of building
  • Type of work to be performed (i.e.: new, addition, alteration, renovation, repairs, etc.)
  • Construction information (materials within cross sections)  
  • Estimated value in dollars of work including materials, installed systems, labour.

6. Important Information Required on all Drawing Plans Submitted

  • Show the owner's name, project name, address, and date.
  • Be drawn to scale and scale must be noted on each drawing.
  • Three (3) complete sets of drawings on blackline or blueline prints on good quality paper without any distortion to drawings.
  • Must have legible letters and dimensions.
  • Clearly show the locations of existing and new construction for additions, alterations, and renovations.
  • Engineer's stamp , signed and dated (if professional design is required - see information below)

Note:  If construction has not commenced within 6 months of the date of issue on the building permit application, the building permit is null and void, and a new permit must be issued.

Engineer’s Report

Professionally sealed plans plus a certified notification of an on-site review or report must be submitted to the Rural Municipality of Headingley by an engineer licensed to practice in the Province of Manitoba for the following but not limited to the following construction works:

  • All preserved wood basement foundations (PWF )
  • Concrete footings and foundations over 40 feet (12.2 meters) in length
  • All concrete basements require an Engineer's stamp regardless of its size.
  • Any building and/or structure that is over 3000 square feet
  • All commercial and industrial buildings

Please Note:

Approval by other jurisdictions for natural gas, hydro, signs along any Provincial roadway*, environmental discharge systems, culvert and driveway access must also require permits. Applications for these approvals must be directed to the appropriate authority, prior to any building within the R.M. of Headingley.

************************************************

 

Important Phone Numbers

Centra Gas Manitoba Inc.                                           
444 St. Mary Ave                                                       
Winnipeg, Manitoba                                                   
# (204)-925-0648 (for residential)                                 
# (204)-925-0802 (for commercial & industrial)              

Manitoba Hydro (electrical permit)
St. James/Assiniboia/Headingley
Customer Service Center
Winnipeg, Manitoba
#(204)-474-4990

Government of Manitoba                                          
Dept. of Environment                                                 
Public Health Inspector                                             
Marvin Bugyik
#(204)-945-0834
(re: holding tanks, cisterns, septic tanks and fields)

Manitoba Telephone System
Prejacking Dept.
#(204)-941-4339

Government of Manitoba                                           
Dept. of Highways                                                    
(structures, signs, buildings, access crossings)          
Bev Abbott                                                               
#(204)-945-8955                                                       

Government of Manitoba
Dept. of Labour
#(204)-945-3397
(permits for structures, buildings, larger than
6400 sq.ft(600 sq.m) and/or more than 3 stories)

 

 

 

 

      All buildings, structures, and signs which are placed on, under or above the ground within the controlled area require permits. Control areas are 125' (38.1m) from the edge of the highway right-of-way except for the planting which is 50'(15.24m) from the edge of the highway right-of-way. Permits are required for P.T.H. No. 1 west if any buildings, structures or signs are placed within 250'(76.2m) from the edge of the highway right-of-way. All accesses onto a P.T.H. or P.R. must also be applied for and approved by application permits.

 

FEES

BUILDING PERMITS:
Residential: 20 cents per sq foot of finished space; 10 cents per sq foot unfinished space eg. Basements, attached garages;  Min fee$300; Max Fee $800
Industrial and Commercial: 20 cents per sq foot; Minimum fee $500

PLUMBING PERMITS:
Residential: $15.00 per fixture to a maximum fee of $110.00
Industrial and Commercial: $15.00 per fixture

SEWER AND WATER CONNECTION
Where available $200.00 for connection fee

LOT GRADING:
Residential: $100.00
Industrial and Commercial: $200.00

REFUNDABLE DEPOSITS (required for construction)
Lot Grading: $500.00
Sewer & Water: $350.00

Road Damage: Asphalt $1,000.00; Gravel $500.00

 

 
 
 

 

 

 

 

 

 

 

 

 

 
Land Use Index
   
Building Permits
Capital Lot Levy
Conditional Uses
Development Agreements
Land Dedication
Land Variances
Planning Amendments
Rezoning Requirements
Subdividing Property
   
  Land Use Home
 
 